Customization: | Available |
---|---|
Product Type: | Lump |
Material: | Mn Metal |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Factory supply best quality manganese metal lump 95 price of manganese metal
Metal lump is made by remelting and ingot cast with the material of electrolytic manganese. And it contains Mn from 93% to 97%. Characteristic Comparing with electrolytic manganese flakes, it is more easy to be added and with less loss.
Specification:
Chemical Composition |
Grade |
||
JMn97 |
JMn96 |
JMn95A |
|
Mn (Min) |
97.0% |
96.5% |
95.0% |
C (Max) |
0.08% |
0.10% |
0.15% |
Si (Max) |
0.4% |
0.5% |
0.8% |
Fe (Max) |
2.0% |
2.3% |
2.8% |
P (Max) |
0.04% |
0.05% |
0.06% |
S (Max) |
0.04% |
0.05% |
0.05% |
Ni (Max) |
0.02% |
0.02% |
0.02% |
Cu (Max) |
0.03% |
0.03% |
0.03% |
Al+Ca+Mg(Max) |
0.07% |
0.07% |
0.07% |
10-50mm,10-100mm or by per customer's requirement.
1.For the smelting of copper alloys, a large amount of manganese is required. Also, the composition is easy to be accurately controlled.
2.Electrolytic metal manganese is widely used in manganese copper alloys, manganese aluminum alloys and 200 series stainless steels. Manganese can improve the hardness, strength, toughness, wear resistance and corrosion resistance of metal materials.
3.Because of its high purity and low impurities, electrolytic metal manganese has been successfully and widely used in various fields such as iron and steel smelting, non-ferrous metallurgy, electronic technology, chemical industry, environmental protection, food hygiene, welding electrode industry and aerospace industry.
Packaging :Plastic woven bag, 1000kg/jumbo bag or according to customer requirements.
Delivery time :Within 7-14 days of receipt of advance payment.